8 • Installation & Configuration
2.2 Connect the Network Cable
Category 5 UTP cable qualifies for both, the Fast Ethernet And Ethernet,
cabling rules. The maximum length of any single cable run between any
station and its supporting Hub is 100 meter .The maximum length of a cable
joining two hubs is 10m in general, but is 100m when both hubs qualify as
Ethernet class 2 Repearters. However, these cable runs may need to be
shorter than the given individual maximum lengths because their maximum
aggregated cable run between any two stations is 205m.
Connecting for 100Mbps Ethernet
Category 5 UTP cable is required for fast Ethernet operation. The maximum
cable run between the cPCI-8211 and the supporting hub is 100 meters.
The cable must be straight (not a crossover cable) with an RJ-45 plug at
each end. Make the network connection by plugging one end of the cable
into the RJ-45 jack of the cPCI-8211, and the other end into a port of the
supporting hub.
Connecting for 10Mbps Ethernet
Category 3, Category 4, and Category 5 UTP cable, as well as EIA/TIA-568
100-0hm STP cable, all qualify under Ethernet cabling rules. The maximum
cable run between the cPCI-8211 and the supporting hub is 100 meters.
The cable must be straight (not a crossover cable) with RJ-45 connector at
each end. Make the network connection by plugging one end of the cable
into the RJ-45 jack of the cPCI-8211, and the other end into a port of the
supporting Hub.